Remove BIM Remove Change Orders Remove Drawings Remove Retail
article thumbnail

Trends in Construction: 3 Ways Technology is Changing Commercial Construction

HardHatChat

We would send those drawings to a printer to copy enough sets to distribute to all the trade partners we were asking to bid the project – often 50 or 60 copies. This time and expense added up to a pretty significant investment.

article thumbnail

Autodesk Build Powers Success for Tetris across an International Design and Build Business

Autodesk Construction Cloud

Tétris specialises in turnkey solutions for corporate clients, managing the design and build of inspiring, functional, and sustainable offices, retail and hospitality spaces. Before we used Autodesk Construction Cloud’s BIM 360 , it was a nightmare,” says Andrea Reina Rojas, BIM Manager for Construction at Tétris. “We

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

A large number of rework requests are generated due to a lack of version control on drawings and plans. When the workers assembling the structure are working from an old set of plans that don’t reflect the latest change orders, rework is practically inevitable. trillion in 2020.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. Requirements.