Remove BIM Remove Change Orders Remove Legal Remove Life Cycle
article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. The “gorilla in the room” is that less than 5% of real property owners both understand and practice total cost of ownership life-cycle asset management. The post Why the BIM Revolution Fizzled appeared first on 4BT.

BIM 100
article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Job Order Contracting. The Obstacles.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM Collaboration – Fact or Fiction?

Building Information Management

BIM Collaboration – Fact or Fiction. The design-bid-build construction delivery method and associated practices such of awarding contracts to the lowest bidder do little more than a fuel to the fires of waste, protracted project timelines, change orders, and legal disputes.

BIM 55
article thumbnail

BIM Strategy, Collaboration, and Interoperablity… Getting it right from square one.

Building Information Management

The construction industry (architecture, engineering, construction, operations/facility management, business product manufacturers, oversight and regulatory groups), like most other sectors, is in a state of rapid change. Job Order Contracting Process.

BIM 40
article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

They drive lower overall costs and virtually eliminate legal disputes. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management. BIM, PROJECT DELIVERY METHODS, WASTE, & LACK OF LEADERSHIP. JOB ORDER CONTRACTING – Overview & Best Management Practices – Job Order Contracting White Paper 2016801.

Contract 100
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. BIM/ BIM EXECUTION PLAN. BIM/ BIM EXECUTION PLAN. The plan describes how BIM will be implemented and which goals will be pursued.

BIM 40
article thumbnail

The Myth of Facility Management Outsourcing

Building Information Management

Sure, its true that many owners lack the education, skills, and capability to consistently execute efficient life-cycle management across their building portfolio, many service providers are in the same position. Significantly Fewer Change Orders. Virtual Elimination of Legal Disputes. Lower Procurement Costs.