Remove BIM Remove Claims Remove Negotiation Remove Software
article thumbnail

BIM IP

Building Information Management

When discussing BIM with those yet to take it up the topic of Intellectual Property invariably comes up. It is so important to them it comes across as a major reason they are not using BIM (although I suspect it is more of an excuse). IP and BIM PROCESS. In the BIM context if everyone shares everyone benefits.

BIM 40
article thumbnail

BIM 101 for Andrew Hayward; Balfour Beatty plc: Head of Ethics, Risk and Assurance

DebunkTheBIM

On Sunday, August the 25 th this year, within this blog I published the third instalment of the story I like to refer to as the ‘HK MTR BIM experiment’. An external consultant was hired to assist with the implementation of this non-complying BIM and engaged over a lengthy period of time. · Missed and/or ignored. ·

BIM 48
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Integrated Project Delivery – IPD, Job Order Contracting – JOC, BIM, and Efficient Project Delivery

Building Information Management

Project delivery methods must therefore be a component of BIM, a fact many/most 3D visualization software vendors appear to have ignored. As scopes of work are jointly developed, discussed, agreed upon and finalized, a JOC contract is much less likely to have claims, change orders, and disputes than other traditional delivery methods.

article thumbnail

A New Resource for JOC – Job Order Contracting Services

Building Information Management

But with construction industry changes swirling around us, Job Order Contracting will continue to evolve and adapt to stay relevant, becoming a part of newer technologies and processes like BIM and collaborative cloud computing, and forward-thinking processes like LEAN, to make JOC even better. UPB and Software Selection.

article thumbnail

General Overview - Construction Cost Estimating Blog

Construction Cost Estimating

Under IAS 11, if a contract addresses two or more assets, the construction of each asset reported for individually if (a) separate proposals were submitted for each asset, (b) portions of the contract regarding each asset were negotiated independently, and (c) costs and revenues of each asset can be evaluated. IAS 11.10]. b) Form of Tender.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Affidavit of Payment of Debts and Claims Form. 01 61 13 Software Licensing Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Affidavit of Payment of Debts and Claims Form. 01 61 13 Software Licensing Requirements.