Remove BIM Remove Infrastructure Remove Legal Remove Procurement
article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Owner Leadership and LEAN Construction Procurement and Project Delivery Save Time and Money. Nonetheless, it would be incorrect to assume that technology alone will solve the AECOO’s dismal legacy of low productivity, waste, and legal disputes. While technology use is accelerating, similar improvement is output are not.

article thumbnail

Autodesk University 2023: Call for Construction Session Proposals 

Autodesk Construction Cloud

This provides the chance to share your opinions about the industry, alternative ways of thinking about challenges like sustainability, skills, diversity and inclusion, procurement, legal issues, and technology trends that the industry should be aware of. Technical Instruction This is the how.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. The business strategy leading to the integration of previously disparate competencies, business processes, technologies, and teams is the primary goal of a BIM execution plan.

BIM 40
article thumbnail

6 Industry Hacks to Overcome Productivity Pitfalls

Autodesk Construction Cloud

To put this in perspective, this equates to about half of the world’s annual infrastructural needs. Procurement. For a contract management paradigm shift to remain sustainable, changes in behaviour, attitudes, and skills are essential for construction professionals and legal advisers. Transparency & Regulation. The end goal?

article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

JOC and SABER are a form of Integrated Project Delivery for existing buildings and infrastructure. Consolidation of procurement – lower overhead cost and procurement cost. Virtual elimination of legal disputes, claims and mitigation of change orders. Legal and Policy Framework. A bit more about JOC -.

article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

JOC and SABER are a form of Integrated Project Delivery for existing buildings and infrastructure. Consolidation of procurement – lower overhead cost and procurement cost. Virtual elimination of legal disputes, claims and mitigation of change orders. Legal and Policy Framework. A bit more about JOC -.

article thumbnail

How the Brits View BIM – Buildling Information Modelling

Building Information Management

What is BIM? A multi-dimensional tool, Building Information Modelling (BIM) involves generating a visual model of the building which also manages data about it, at the design stage, throughout the construction phase and during its working life. NBS National BIM Report 2013. Introduction. Download report. IFC/COBie Report 2012.

BIM 51