Remove BIM Remove Legal Remove Modeling Remove Procurement
article thumbnail

The Legal Aspects of BIM

Building Information Management

Many remain confused about the meaning and value of BIM (building information modeling). BIM is the efficient full life cycle operation of the built environment, with the promise of managing Total Cost of Ownership (TCO) and associated physical and functional conditions in concert with an organization’s changing needs.

Legal 40
article thumbnail

The Legal Aspects of BIM

Building Information Management

Many remain confused about the meaning and value of BIM (building information modeling). BIM is the efficient full life cycle operation of the built environment, with the promise of managing Total Cost of Ownership (TCO) and associated physical and functional conditions in concert with an organization’s changing needs.

Legal 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The fundamental reason for poor outcomes is the failure to implement and properly manage robust and integrated LEAN planning, procurement, and project delivery processes. The errors and poor processes result in change orders, project delays, and legal disputes.

Schedule 163
article thumbnail

30+ Releases for Autodesk Construction Cloud

Autodesk Construction Cloud

In November, we have more than 30 product releases across Autodesk Construction Cloud platform and products including Autodesk Build, Autodesk BIM Collaborate, Autodesk Takeoff, Assemble, BuildingConnected, and BIM 360. Autodesk BIM Collaborate . features on both Autodesk Construction Cloud unified platform & BIM 360 .

article thumbnail

What’s Really Needed to Make BIM Work.

Building Information Management

Building Information Management (that’s right forget the “modeling” distraction), BIM, is the life-cycle management of the built environment supported by digital technology. What is required to accomplish BIM? each having their own value, contribution, level of permanence, etc.

article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

Best value procurement. They drive lower overall costs and virtually eliminate legal disputes. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management. BIM, PROJECT DELIVERY METHODS, WASTE, & LACK OF LEADERSHIP. Job Order Contracting – A Procurement Success Story, 1998. Key characteristics of OpenJOC.

Contract 100
article thumbnail

6 Industry Hacks to Overcome Productivity Pitfalls

Autodesk Construction Cloud

Imagine, for example, what could happen if the government incentivised industry-wide innovation by prescribing the means and methods of delivery (example: de-carbonisation targets) or mandating the use of certain technologies (example: BIM mandates). Procurement. The end goal? Implementation.