Remove Blog Remove Design Remove Estimating Remove Inspections
article thumbnail

Hazardous Waste Management: How Environmental Consulting Can Help

Construction Marketing

Inspection And Monitoring Redevelopment projects or new construction are significant contributors to waste generation. This usually includes site inspection and monitoring to analyze, assess and understand the estimated environmental damage caused by new projects.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Effective Marketing For Diverse Construction Job Categories

Construction Marketing

Architects Design and plan construction projects, considering both aesthetic and functional aspects. Engineers (Civil, Structural, Mechanical, Electrical) Civil engineers focus on the design and maintenance of infrastructure. Structural engineers design and analyze structures for stability and safety.

article thumbnail

Construction Cost Estimating Blog: Electrical Estimating Takeoff Sheet

Construction Cost Estimating

Construction Cost Estimating Blog. Electrical Estimating Takeoff Sheet. Electrical Takeoff will provide the most accurate takeoff specifically designed for your company. We can do this by using the best estimator and database, which is continually updated. adsense analytic. Thursday, November 10, 2011.

article thumbnail

‘New hospital’ design needs to be reconsidered

Construction Law

Few of the projects in what became the New Hospital Programme (NHP) were on inspection found to be ‘new hospitals’ anyway; the 40 was made up mostly of extensions and refurbishments. But it warns that this hospital design might be too small and the design should be reconsidered. has been assessed as providing £4.80

Design 52
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229