article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

All elements of the project must be reduced to a cost that can be accounted and budgeted at a line item level. Project Delivery Phase Transitions: Estimates should be tracked throughout the life of the project and assumptions and estimate information must be well documented, including changes and what is and what is not in the estimate.

article thumbnail

Behind the Build: Interview with Isabel Harlan, Sr. Engineer and Project Manager at Hatch LTK

Autodesk Construction Cloud

I use my diverse background of experience to connect the various disciplines and ensure that we are not working in silos and not overlooking any critical interface points, which often happens on the larger projects, so that we provide a holistic and thorough product for our clients while keeping schedule, budget, and other resources in check.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

7 Best Button-Down Work Shirts for Men

Work Gearz

Work shirts find their beginnings towards the late 1800s with laborers such as miners, railroad workers or outdoor professions. This is a real budget buy, and we couldn’t resist including it because of the reasonable price. Budget buy. Buttons are vintage in style. Made in India, it is machine washable. 100% cotton.

article thumbnail

Feature Story: Shovel-Ready Sites – Fired Up, Ready To Go

Buisness Facilities Contributed Content

Communities who can’t complete the entire process can obtain guidance online with strict instructions and use it as a roadmap for capital budgeting and determine a plan over the next several years.”. The certification process provides detailed documentation about a site’s price, availability, utilities, access, and environmental standing.

Site 66
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Funds may be provided for the construction and/or improvement of water lines & wastewater facilities, sewer lines, sewage treatment facilities, roadways, natural gas-line services, electric power services, railroad spurs, lighting, sidewalks and alternative power sources such as solar. Railroad Spurs. Natural Gas-Line Services.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The statute allows the Energy Commission, with an annual program budget of approximately $100 million, to use grants, loans, loan guarantees, revolving loans and other appropriate measures to support projects that: Develop and improve alternative and renewable low-carbon fuels. The fund will provide loans ranging from $100,000 up to $500,000.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

In short, project teams, including owners, better deliver structures according to their capabilities, requirements, timelines, and budgets. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 31 16 Project Budget Information. Requirements.