Remove CAD Remove Deals Remove Modeling Remove Negotiation
article thumbnail

BIM IP

Building Information Management

For some reason BIM authors (architects, engineers, etc) think that because they create the initial BIM information they have the right to full control and to charge for the BIM model throughout the life of the building. The architect doesn’t model ductwork, they use the mechanical engineer’s model.

BIM 40
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

The project proposes sustainable solutions for Detroit’s 48204 ZIP code • Led the initiative to transition from CAD to BIM construction documentation and introduced several technical innovations to streamline operations • Created a custom BIM content library with hundreds of host components and subcomponents.