Remove CAD Remove Deals Remove Schedule Remove Structural Engineering
article thumbnail

When is a discrepancy not really a discrepancy?

DebunkTheBIM

The structural engineer sizes the concrete column; the architect places it in the space. There is a code on the structural drawing that can be tracked to the schedule and the dimensions are noted. They both are confident to be following well established building-documenting practices.

article thumbnail

BIM IP

Building Information Management

The architect schedules doors, the hardware supplier adds to that schedule, they don’t create their own. The architect doesn’t model ductwork, they use the mechanical engineer’s model. CAD files). Editable schedules from the BIM model (e.g. But the theft itself is no easier. LOSS OF CONTROL.

BIM 40