article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

Viewpoint software seamlessly integrates with BIM for increased collaboration. Level 0 : Level 0 entails basically no collaboration, and only 2D CAD drafting is used. Level 1 : Level 1 BIM is a combination of 3D CAD and 2D for drafting. BIM Levels. Communication is done via paper and basic prints. RACI Indicator.

BIM 150
article thumbnail

don't think: Do Revit: Inspiration from AU

Do

From Reference other View you can choose either drafting views (good for site/existing condition photos) or any view saved as a "rendering" (image) in the project. Of course, because its an elevation tag, it will carry the sheet/detail number references when you place your drafting or rendering view onto a sheet. Posted by.

Revit 61
article thumbnail

don't think: Do Revit: QUACK!

Do

The first thing is I dont think the next big innovation will really be in what we might call the traditional "CAD (Computer Aided Design)" space. The comments and blog entries on this site represent the viewpoints of the author only. What am I interested in? Revit It (francois). BIM)X: A contractors BIM blog. Revit Zone. Revit Search.

Revit 54