Remove catalog electrical-3
article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Include electrical and mechanical schematics and diagrams and diagnostic techniques necessary to enable operation and troubleshooting of the system after acceptance. On diagrams, number electrical and electronic wiring and pneumatic control tubing and the terminals for each type, identical to actual installation configuration and numbering.

Equipment 227
article thumbnail

6 Advantages of Industrial Stairs

Construction Marketing

3) Custom Design. Industrial stairs can come from a catalog of standard designs that feature straight, with top landing, u-shaped, alternating tread, cross-over, or stair towers to suit the needs of various buildings and industries. . They also termite-resistant, do not rot like wood, or crack like concrete.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Contractor Marketing That Works: Some of What's Old Will Hopefully.

Constructor Marketing that Works

HVAC Marketing, Plumbing marketing, Electrical contractor marketing can be tough. Thats why weve assembled the best plumbing, electrical and hvac marketing strategies onto one site. Penney’s catalog from 1977 containing hideosities I’ve either blanked out from having seen, or no one ever bought them, which might explain J.

article thumbnail

THE line of jet-set? water jets | Tools content from Contractor.

Contractor Magazine

Ranging from the JM-1450 compact electric jet to the JM-2512 Typhoon trailer jet, General has a jet for you. Learn more about General’s full line in our new Jet-Set catalog. Posted 3 weeks ago in As I See It. Posted 3 weeks ago in From the Mechanical Underground. Visit www.drainbrain.cpm/jets. Advertisement. ); //.

article thumbnail

Factors impacting standby generator costs

CK Power

In addition to state and municipal regulations, you’ll need to pay attention to nationwide standards such as NFPA 110 (the standard for emergency and standby power systems), the National Electrical Code® and NFPA 99 (health care facilities code) if applicable. Let’s say your system needs to be able to run for 96 hours without refueling.

article thumbnail

Begin With the End in Mind: A Practical Guide for Facility Management Optimization 

Autodesk Construction Cloud

Better focus on the owner The current handover and closeout process results in the loss of data, creating more work for owners and facilities managers to manage complex MEP (mechanical, electrical, and plumbing) systems and building components.

article thumbnail

NIBS – Building Innovation 2012 – January 7th-11th, 2012, Washington, D.C.

Building Information Management

3: Building Innovation 2013 is the only place you’ll find the authentic event on federal construction: FEDCon® — The Annual Market Outlook on Federal Construction — where attendees will hear the most authoritative, up-to-date information on federal agency building and infrastructure budgets, construction forecasts and regulatory updates.