article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

IFC Certification Procedure (IFC 4×4**). Certification testing is a process for testing software’s conformance with a given IFC release specification and its subsets, defined as views. In 2010 buildingSMART developed the new IFC Certification 2.0 In 2010 buildingSMART developed the new IFC Certification 2.0

BIM 40
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

State Credits available against the Corporate Income Tax: Education Credit (AS 43.20.014): Taxpayers that contribute to vocational education programs or accredited Alaska universities or colleges for educational purposes or facilities may claim a tax credit for 50% of the first $100,000, 100% of the next $200,000, and 50% of further contributions.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Upon acceptance and certification of work completion by the Owner, all required delivery order data will be filed in the JOC electronic record system and other required areas.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The program is capped at 10,000 new jobs being claimed each year by all participants; whereas a taxpayer is limited to a maximum of 400 new jobs per year. The credit provided to the investor totals 39 percent of the cost of the investment and is claimed over a seven-year period. time permanent jobs paying above average wages.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. When it is both feasible and safe, the environmental conditions being monitored should be altered to actuate the device. Ensure the pressure vessel inspection certificate is posted at machine.