Remove Certification Remove Feasibility Remove Modeling Remove Washington
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

Building Information Modeling Model Management. BIM is a term which represents three separate but linked functions: Building Information Modeling: Is a BUSINESS PROCESS for generating and leveraging building data to design, construct and operate the building during its lifecycle. IFC Certification Procedure (IFC 4×4**).

BIM 40
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

If applying for a transferable credit certificate, no more than half the credit may be applied in a single calendar year. ARB must approve hybrid truck and bus models for them to become eligible for the program. Please Note: Feasibility Grants may be used in conjunction with Total Project Participation Grants. 50,000 (max.)

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

GA companies can implement Work Ready two ways—through job profiling and Work Ready Certificates. Companies match those profiles to employees’ Work Ready Certificates, which measure core skills, to ensure the right person is placed in the right job. See www.gaworkready.org.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. When it is both feasible and safe, the environmental conditions being monitored should be altered to actuate the device. Ensure the pressure vessel inspection certificate is posted at machine.