Remove Change Orders Remove Design Remove Life Cycle Remove Risk
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Define estimate’s purpose ■ Determine estimate’s purpose, required level of detail, and overall scope; ■ Determine who will receive the estimate Develop estimating plan ■ Determine the cost estimating team and develop its master schedule; ■ Determine who will do the independent cost estimate; ■ Outline the cost estimating approach; ■ Develop the estimate (..)

article thumbnail

BEST VALUE & COMPLIANT Construction Planning, Procurement, And Project Delivery

Job Order Contracting

It is not design-bid-build, design-build, CM@R, LastPlanner(TM), black belt, kaizen, et al. LEAN, BEST VALUE construction, planning, procurement, and project delivery is embodied with collaborative processes and frameworks such as integrated project delivery, IPD, and LEAN job order contacting (i.e. the OpenJOC(TM) Solution).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

As a result of 1800+ tests, researchers have concluded that a primary cause in low project performance (time, cost and customer satisfaction) is the traditional owner-vendor relationship in which the owner uses a design, bid and build (DBB) approach. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

OpenJOC Job Order Contracting Framework embeds LEAN best management practices and Key Performance Indicators (KPIs) for cost, performance, and time, with an overall focus upon best value outcomes. Leverage of local expertise and domain knowledge combined with global oversight, collaboration, and continuous improvement.

Contract 100
article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

While a project’s ultimate goal is a successful completion, the steps it takes to get there are critical to profits and project’s life cycle. By choosing the right one for your project, overall risk can be reduced, and budget and schedule can be better managed. Risks: exposure to danger, financial loss and harm to the brand.

Risk 52
article thumbnail

Top 10 ERP Solutions for Construction Firms

Construction Marketing

Acumatica Construction Edition keeps your team on the same page, relying on a core system that has the latest project reports, contracts, budgets, plans, specifications, change orders, invoices, purchase orders and job costs. Reflex ERP. Oracle ERP.

Software 200