Remove Change Orders Remove Drafting Remove Drawings Remove Negotiation
article thumbnail

Digital Builder Podcast Ep 22: How Specialty Contractors Can Navigate Contracts & Get Paid On Time

Autodesk Construction Cloud

Best practices for handling change orders. Karalynn also brought up the tendency of the industry to pass liability down the chain when drawing up contracts. For this reason, construction professionals must find better ways to craft and negotiate agreements. We discuss: The current state of construction contracts.

article thumbnail

Commercial Construction Tips: Six Best Practice Resolutions for 2011

HardHatChat

I’m sure some of you don’t have the time to draft a list of resolutions, so I’ve done it for you – you can thank me later. Now, how many of you have had to pay for a second set of drawings because your GC found something that would alter the architect’s original plans? Bring your GC in early. Take a leap of faith.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

The Contract Specialist drafts the a “JOC Request for Proposal” , assigned a project number, and obtains appropriate approvals and signatures. The Contract Specialist e-mails a copy of the RFP to the contractor and other stakeholders, and adds the project/”task order” to the “Active” status.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.