Remove Change Orders Remove Drafting Remove Estimating Remove Schedule
article thumbnail

JOC Procedures

Job Order Contracting

JOC PROCEDURES FOR ORDERING WORK . Initiation of a Job Order. Contract Administrator notifies the Contractor of a Project, schedules a Joint Scope Meeting, and issues a Notice of Joint Scope Meeting. All Supplemental Job Orders follow the same workflow and procedures as the original work order.

article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage Estimating Sage Estimating can significantly accelerate the estimating process for several construction firms. As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors.

Bidding 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

free electrical estimating softwares

Construction Cost Estimating

Electrical Calculations Electrical Calculations is one of the best free electrical estimating software mostly suitable for Electrical Engineers and tradesmen. It is also free electrical estimating software. This free electrical estimating software provides assistance to electrical professionals with the estimating/bidding process.

article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

The Contract Specialist drafts the a “JOC Request for Proposal” , assigned a project number, and obtains appropriate approvals and signatures. The Contract Specialist e-mails a copy of the RFP to the contractor and other stakeholders, and adds the project/”task order” to the “Active” status.

article thumbnail

A position is vacant for Senior Engineer in Houston, Texas

Construction Cost Estimating

Job Role: Plans, schedules, manages, and organizes complete level of engineering work for a global business unit generally in one discipline in a project or staff group. Drafts letters independently to vendors and clients. The location of the job will be Houston, Texas, United State. Evaluates bid analyses and makes recommendation.

Houston 40
article thumbnail

DD# 80: P6 Deep Dive: Underutilized Feature in P6

Cassell Construction Estimating

A document is any reference associated with an activity such as a drawing, test plan, change order, or user manual. This location type is primarily used draft documents that are not ready for general distribution. Smooth scheduling! A work product is a result of action associated with the deliverable of an activity.

article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

Besides, this application includes concrete and excavation formulas that help in estimating the concrete and bricks required. construction cost estimating construction cost estimating books construction cost index construction data construction education program construction estimating apps'

iPad 45