article thumbnail

Why the majority of CMMS System Implemenations Fail

Building Information Management

For example, virtually none of the major (or even minor) CMMS or IWMS technology vendors incorporate a standardized cost database, such as RSMeans, from which users could compare their actual material, equipment, and labor costs against a localized reference standard. “Just plain stupid”, right? That’s the hard question.

article thumbnail

Collaboration, Transparency, Accuracy, Process, and supporting Technology – The Keys to Improved Productivity for Building Construction, Renovation, Repair, and Sustainability

Building Information Management

While its true that cloud computing is an enabler, with its role to support the cost effective integration of various knowledge domains and technology silos; the underlies processes linked to a collaborative project delivery method focused upon life-cycle management is the critical aspect.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. BIM (Building Information Modeling) is the life-cycle management of the built environment supported by digital technology. As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards.

BIM 40
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

Unproductive ad hoc processes traditionally associated with the design, construction and management of the built environment are being replaced by robust life-cycle management and efficient project delivery methods. management of the built environment are being replaced by robust life-cycle management and efficient project.

BIM 40
article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

While a project’s ultimate goal is a successful completion, the steps it takes to get there are critical to profits and project’s life cycle. During this process, consider how much wiggle room is available for change orders, most likely an inevitable occurrence once a project is underway and can be costly if not well planned.

Risk 52
article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Construction Arbitration

Constructlaw

The Project Nearly all construction arbitrations stem from the execution of a tangible piece of work, often referred to as the project. As a result, and often depending on the nature of a project, some subcontractors play outsized roles during the life cycle of a particular project. Design architects and engineers.