Remove Claims Remove Permits Remove Sewer Remove Subcontracting
article thumbnail

#75:  Recovery for Defective Work After Termination for Convenience

NH Construction Law

Many contracts specify that an owner may terminate a contractor, and many subcontracts specify that a contractor may terminate a subcontractor, either for cause (i.e., ” Depriving a terminated contractor of an opportunity to cure defects was likewise the basis for rejecting defective workmanship claims in TRG Construction, Inc.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Internal Revenue Code Credits Adopted by Reference (AS 43.20.021): Under Alaska’s blanket adoption of the IRC, taxpayers can claim all federal incentive credits.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. Eligibility qualifications are different for rural and metro areas.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. 00 31 43 Permit Application. 00 31 46 Permits.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. 00 31 43 Permit Application. 00 31 46 Permits.