article thumbnail

Steel Bar Processor Investing $36.9 Million to Locate in Porter County

Buisness Facilities Contributed Content

As part of processing, the steel will go through cleaning, drawing, cutting, straightening, testing and bundling before being shipped to automotive, agricultural, off-road equipment, hydraulic and tool making customers. “We

Indiana 40
article thumbnail

Steel Bar Processor Investing $36.9 Million to Locate in Porter County

Buisness Facilities Contributed Content

As part of processing, the steel will go through cleaning, drawing, cutting, straightening, testing and bundling before being shipped to automotive, agricultural, off-road equipment, hydraulic and tool making customers. “We

Indiana 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

6 Phases of the Construction Process

Chianelli Estimating

Drawings for plans, equipment details and schedules as well as other key construction documents are also generated at this stage. Commissioning and Turnover Stage. In sub-phases two through four, schematics are developed and budgets are further refined. Construction Stage. In this phase, actual construction begins. Quality Control.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. Examples: project management & coordination 47, temporary facilities & controls, cleaning & waste management, commissioning. Task - a distinct piece of work performed.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.

article thumbnail

LOCATION FOCUS: Texas: Big Heart, Country, Business

Buisness Facilities Contributed Content

Pauken is the chairman of the Texas Workforce Commission. Waxahachie’s regional draw and numerous manufacturers make building a customer base a breeze. The firm has signed new 20-year contracts with two large Japanese power companies to export liquefied natural gas from the facility and is reportedly in negotiations with a U.S.

Texas 45