Remove Comparison Remove Compensation Remove Documentation Remove Overhead
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. The contractor is responsible for submitting documentation that substantiates the proposed approach.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. The Owner will be required to deliver such materials to the job site or compensate the Contractor for providing labor to deliver Owner-furnished materials to the job.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ARM port of EEL2 - Cockos Confederated Forums

Construction Dive

this is a bit of side note: i was curious on the performance situation when using software floating point in comparison to hardware, so i had to run some tests in this aspect. Shoddy documentation for IX JS Plugins. this will certainly reduce the jump overhead (the 32mb limit though.). Join Date: Apr 2008. Posts: 508.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Note all deteriorated areas on the roof plan for comparison later on the roof. As of this writing, the most recent document was authored in 1997.