Remove Comparison Remove Drafting Remove Estimating Remove Inspections
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

THE ESTIMATING PROCESS FROM A TO Z Here in this cover story we are going to present you the basic details of the estimation. First, we have to download the estimating and budgeting spreadsheet. CUSTOMIZING THE ESTIMATING AND BUDGETING WORKSHEET This is an excel format of spreadsheet. A patience read is necessary here.

article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

From safety training and accident prevention to AR building assistance, technology does indeed belong on the drafting table and the construction site alike. Although exact figures are hard to nail down, construction equipment and material theft from job sites is estimated to be between 300 million and 1 billion annually.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Assignment of Benefits for Contractors: Pros & Cons of Accepting an AOB

Levelset

An insurance carrier’s claims adjuster will inspect property damage and arrive at a dollar figure calculated to cover the cost of repairs. Often, you might feel this adjuster may have overlooked some details that should factor into the estimate. You may sink a considerable amount of time into preparing an estimate for a customer.

article thumbnail

Examining OSHA’s Pending IIPP Standard

Safety Services Company

OSHA is accepting input during the drafting phase, but has officially stated the following will be required IIPP inclusions: Hazard Identification/Assessment: A written process by which hazards will be identified. This standard, however, will make it a requirement as well as set guidelines for what must be included in the program.

OSHA 48
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. After contract award, the time required to estimate, propose, negotiate, and issue TOs for individual projects is four weeks, or less; and. Introduction. 3.6.1.2.

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. In Belen, BNSF operates the largest inspection yard on the southern transcontinental corridor, linking Southern California and Chicago, and serves as a regional maintenance and fueling facility for trains up to 10,000 feet long.