Remove Comparison Remove Drafting Remove Feasibility Remove Inspections
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

Building & Engineering Field Inspections 9. Re-Inspection Fee/Extra Inspections 15. In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. Draft ranges have special emission necessities that have got to be closely followed for correct performance.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Determining the feasibility of using other DoD contracts. The level of architectural/drafting support performed by the contractor (not to be interpreted to mean A-E services); 3.5.3.1.6. Include required cost comparisons, justifications, and approvals. SABER Inspection and Acceptance. Site visit.