Remove Comparison Remove Drafting Remove Inspections Remove Permits
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

On the opposite hand, you may need to interrupt down some classes or line-items more, like Permits and charges generally Conditions or Countertops in room & tub. Building Permit 3. Electrical, Plumbing, Mechanical Permits 4. Building & Engineering Field Inspections 9. Pavement Cut Permit Fee 10.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

The level of architectural/drafting support performed by the contractor (not to be interpreted to mean A-E services); 3.5.3.1.6. Include required cost comparisons, justifications, and approvals. SABER Inspection and Acceptance. Include a statement of work, including concepts, sketches, and drawings; 3.6.1.3. Site visit.

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. In Belen, BNSF operates the largest inspection yard on the southern transcontinental corridor, linking Southern California and Chicago, and serves as a regional maintenance and fueling facility for trains up to 10,000 feet long.