Remove Comparison Remove Drawings Remove Feasibility Remove Software
article thumbnail

Total Station in Surveying | Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Selection of a particular model, together with the associated data collector and CADD software , requires some study. Distance resolution is either pulsed (low precision) or phase comparison (average -± 2 to t 5 millimeter(mm) accuracy). A good place to being is viewing periodic surveys by trade publications.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Government and commercial software is available for localization and for compiling task listings and unit prices. Determining the feasibility of using other DoD contracts. Identification of the applicable UPG and any required related software, hard copies, and/or computer support requirements; 3.5.3.1.4. Coefficients.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Typically, this is by done via email, or within some form of online/collaborative software program.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Note all deteriorated areas on the roof plan for comparison later on the roof. Defragment the hard drive using the Windows defragmentation utility or third party software on the workstation or server. Perform disk cleanup Windows disk cleanup utility or third party software on the workstation or server 3. Laptop Workstations.