Remove Comparison Remove Drawings Remove Office Remove Overhead
article thumbnail

Common Types of Construction Contracts And Their Use

cnstrctr

For the examples I’ll be using a 10 storey office tower as the example building. Competitive Value – if the drawings are complete, having competitively tendered the project can create value as people try to beat each other for the project. It allows you to start construction before the drawings are complete.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Determining the organizational structure of the SABER post-award surveillance and administration office.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Note all deteriorated areas on the roof plan for comparison later on the roof. Recommended Tools, Materials, and Equipment: 1. Standard Tools – Basic.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. Where specific materials, equipment and/or fixtures have been specified by name, manufacturer, or catalog number, it has been done to set a specific minimum standard and reference for comparison as to quality, longevity, and performance.