Remove Comparison Remove Feasibility Remove Security Remove Software
article thumbnail

Federal Facilities – Implementation of Energy Savings Projects and Performance-Based Contracting for Energy Savings

Building Information Management

Learn more: Software , JOC White Paper , A Comparison of Cost Estimation Software Tools. b) Consistent with section 432 of the Energy Independence and Security Act of 2007 (42 U.S.C. The White House. Office of the Press Secretary. For Immediate Release. December 02, 2011. Transparency and Accountability. (a)

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

In March, IBM announced a new 800-job technology center in downtown Baton Rouge that will provide software development and software maintenance services to clients in the U.S. with services that address the increasing demand for flexible software to keep up with Big Data, cloud and mobile requirements they are facing.

Metro 110
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Total Station in Surveying | Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Selection of a particular model, together with the associated data collector and CADD software , requires some study. Distance resolution is either pulsed (low precision) or phase comparison (average -± 2 to t 5 millimeter(mm) accuracy). Handle securing screw. Both laser and infrared EDMs are utilized. Battery cover.

article thumbnail

Cover Story: Global Biotech Report

Buisness Facilities Contributed Content

NWEH works to unlock the value of routinely collected health care data and provides software and information systems that allow healthcare data to be linked and utilized. Services cover the spectrum of clinical trial feasibility, study design, study mobilization, study management, data linkage, real world evidence and analysis and reporting.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Security Bollards/Barricade. Application: This standard card applies to automatic hydraulic security Bollards/Barricades found at driveway entrances, and other areas where vehicular traffic must be controlled. Notify affected personnel before performing PM (alarmed or security entrances). Gates and Fences, Security and Access.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Government and commercial software is available for localization and for compiling task listings and unit prices. Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. Determining the feasibility of using other DoD contracts.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Contractor is responsible for receiving and securing materials, including unloading of delivery trucks, checking deliveries, and transportation to the work area. Delivery of Proposals.