Remove Compensation Remove Feasibility Remove Permits Remove Security
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Security Bollards/Barricade. Application: This standard card applies to automatic hydraulic security Bollards/Barricades found at driveway entrances, and other areas where vehicular traffic must be controlled. Notify affected personnel before performing PM (alarmed or security entrances). Gates and Fences, Security and Access.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. The Participating Lender sets all the terms and conditions of the loan (including premium levels, maturity dates, fixed or variable interest rates, secured or unsecured, amortization schedule, etc.) For more information, please visit this link.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. FOREIGN TRADE ZONES (FTZs): Secured areas legally outside of U.S.

Income 75
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. Determining the feasibility of using other DoD contracts. The team can decide how many coefficients to use. Determining the appropriate minimum and maximum contract amounts.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

A single award ID/IQ contract often makes it difficult for the government to secure the same price reductions and contractor performance improvements that would occur if the contractor was competing against other qualified contractors throughout the contract. FMS concluded that the benefit of oral presentations is not just saving time.