Remove Compensation Remove Guidelines Remove Overhead Remove Schedule
article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Establishing and enforcing these guidelines as part of your daily operations can significantly reduce the number of falls on the job. . Financial distress can result from a lack of skilled labor and possible workers’ compensation insurance claims. . Getting caught in or between. Electrocution.

Safety 52
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). Scheduling.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Schedule maintenance on these doors so that it does not interfere with loading dock operations.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting GUIDELINES & PROCEDURES. The Owner will be required to deliver such materials to the job site or compensate the Contractor for providing labor to deliver Owner-furnished materials to the job. The Contractor shall supply all required insurance prior to starting the project on the scheduled date.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

These contracts allow the government to acquire an indefinite quantity, within stated limits, of supplies or services during a fixed period, with deliveries or performance to be scheduled by placing orders with the contractor. Implementing guidelines are set forth in FAR Subpart 16.5. Relationship to Other Contracting Authorities.