Remove Compensation Remove Negotiation Remove Overhead Remove Permits
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. TO negotiation. Coefficients. The team can decide how many coefficients to use. 3.6.4.3.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 45 26 Workers Compensation Certificate Schedule. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. Conditions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 45 26 Workers Compensation Certificate Schedule. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. Conditions.