Remove Concrete Remove Materials Remove Overhead Remove Subcontracting
article thumbnail

2020 Guide to Construction Cost Estimating

Job Order Contracting

Material costs are either. The base rate does not include overhead and profit, however, can be added if needed. In addition, highly specialized subcontract items may require travel and per-diem expenses for mechanics. Material Costs. Material costs are local for commodities such as concrete, asphalt and aggregate.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Practical Guide to Construction Accounting Software

Autodesk Construction Cloud

Instead of operating from a fixed location with a fixed set of products or services, construction projects rely on a range of locations, materials, and services. To make things even more complex, items that you might consider overhead expenses are often actually costs of goods sold because they are connected to a client project.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. Existing Concrete Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. Existing Concrete Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

JOC, an annual contract and multiple option year agreement for general construction, generally requires the Contractor to e furnish associated labor, tools, materials, equipment and transportation. All cash discounts should be deducted in determining material costs. Job Orders / Task Orders.