Remove Conference Remove Documentation Remove Overhead Remove Subcontracting
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Subcontracts. At the completion of the project, any savings associated with the Subcontract may be required to be passed along to the Order by way of a change order.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. Last Updated: February 19, 1999.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 32 33 Photographic Documentation.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 32 33 Photographic Documentation.