Remove Contractors Remove District of Columbia Remove Life Cycle Remove Schedule
article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Ordinary maintenance means routine recurring work that is incidental to everyday operations; preventive maintenance means work programmed at scheduled intervals. Service levels are based on the effort required to service space for a five-day week, one eight-hour shift schedule.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Ordinary maintenance means routine recurring work that is incidental to everyday operations; preventive maintenance means work programmed at scheduled intervals. Service levels are based on the effort required to service space for a five-day week, one eight-hour shift schedule.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. The topics include the use of BIM in: student projects, interdisciplinary collaboration in studios, scheduling and estimating classes, IPD projects and facilities management. buildingSMART alliance Conference.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. The topics include the use of BIM in: student projects, interdisciplinary collaboration in studios, scheduling and estimating classes, IPD projects and facilities management. buildingSMART alliance Conference.

BIM 40
article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

We have their full product life cycle and tools here with kiosks and other types of interface points where people can actually touch and feel those types of solutions to understand how they work. Lockheed Martin expects the construction effort to employ a total of 1,500 contractors during the three-year construction phase.