Remove DC Remove Feasibility Remove Management Remove Visualization
article thumbnail

The Complexity Of OSHA’s PSM Standard

FDR Safety

I recently attended the 2 nd Annual Process Safety Summit in Washington DC on Oct 15-16, 2019. To help our clients that deal with PSM, we would draw your attention to the top 5 most cited standards from PSM NEP : Mechanical Integrity Process safety information PHA Operating procedures Management of change.

Risk 223
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. If the insulation is known or suspected to contain asbestos, check the building’s asbestos management plan to see it has been tested for asbestos. Manage asbestos in accordance with the plan. Check bolt torque.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

Building Information Modeling Model Management. Building Information Management: Is the ORGANIZATION & CONTROL of the business process by utilizing the information in the digital prototype to effect the sharing of information over the entire lifecycle of an asset. For example the lack of using an information management strategy. (3)

BIM 40
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Office of Management and Budget (OMB). Copies of this publication may be obtained from the Executive Office of the President’s Publications Office by calling 202-395-7332, or writing the Office of Publications, 725 17th Street, NW, Room 2200, New Executive Office Building, Washington, DC 20503. Office of Management and Budget.