article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). Worked at client sites as a Field Surveyor documenting as-built construction, occupancy, protection and exposure as it pertains to the real property insurance industry.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). Worked at client sites as a Field Surveyor documenting as-built construction, occupancy, protection and exposure as it pertains to the real property insurance industry.

BIM 40
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect ground area beneath equipment to insure no sharp objects and that the ground surface cushioning is adequate for the piece of equipment. Check operation of safety switches to insure they have not been by-passed. Visually inspect safety notices and placards. Replace if necessary. Check Points: 1. Tighten connections.