article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

The most important step to take before an OSHA inspection even takes place is selecting a company representative. The company representative is the individual charged with representing the company’s interests during an OSHA inspection. Determining the type of inspection being conducted and the intended scope.

OSHA 156
article thumbnail

Recladding Multi-Family Buildings: Why And When?

Construction Marketing

Durability and longevity : Quality cladding acts as a defense against wear and tear, prolonging the life of the building. Reports of water leaks or drafts from residents. Assessment Before anything, conduct a thorough inspection to gauge the extent of damage and the type of recladding required.

Safety 309
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

ft) flame under controlled conditions of draft and temperature onto the surface of a 7.4-m Warranties for FRTW are manufacturer-specific and must be submitted by the authorized company official indicating the FRTW is manufactured under independent third-party follow-up inspection and that it meets or exceeds the code requirements for FRTW.

article thumbnail

constructionattorneyblog: Mold White Paper Issued

Construction Lawyer

The cases with which he has been involved are varied and wide-ranging and include personal injury, breach of contract, criminal defense, commercial disputes, and consumer fraud. " The Commercial/Multifamily Mold Working Group took careful steps to fully research, draft and finalize this paper.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Appendix 2 illustrates the fair opportunity for consideration approach used in the Defense Enterprise Integration Services II (DEIS II) multiple award contracts. The goal was to expedite the process of providing draft RFPs to industry and obtaining their feedback, a process which can take six months to a year to finalize.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Sussex County fee reductions may include graduated property tax abatement over a 10-year period, as well as reductions in building permit, building code, planning and zoning, sewer review and sewer inspection fees.

Income 108