Job Order Contracting

The benefits of collaborative teams working within an integrated Planning, Procurement, and Project Delivery Environment are well documented. The key is to set up a programmatic approach, within with all projects are planned, procured, and executed. Training and support for your teams and all awarded contractors.

article thumbnail

Collaborative Construction Solution

Job Order Contracting

Traditional contracting methods such as design-bid-build, and even somewhat newer developments such as design-build typically involve the non-owner participants providing lump-sum price based an owner’s proposed requirements. Contact Us. Or, request the white paper. Additional Information.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

8 of the Latest Integrations with Autodesk Construction Cloud

Autodesk Construction Cloud

Join us (in-person) at Autodesk University 2022 , September 27-29, in New Orleans. Arclan is a knowledge-base for design and construction projects that automatically collects events and details from tools and services you use and turns it into useful information curated for all team-members working on the project based on relevancy.

article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

JOC reduces unnecessary levels of engineering, design, and contract procurement time along with construction project procurement costs by awarding long- term contracts for a wide variety of renovation, repair and new construction projects. Smaller projects were taking up to 1 year to procure creating a growing backlog of work.

Contract 100
article thumbnail

JOC Program Guide

Job Order Contracting

Building a successful and compliant JOC Program requires a focus upon LEAN construction procurement and delivery best management practices. Our team, which includes JOC, cost data, and facilities capital planning professional with prior experience with the RS Means Company, LLC, The JOC Group, US Cost, and VFA, Inc.