Remove Design Remove Estimating Remove Inspections Remove Risk
article thumbnail

Hazardous Waste Management: How Environmental Consulting Can Help

Construction Marketing

Prolonged exposure to toxic chemicals and substances can increase the risk of severe diseases like cancer, pneumonia, tuberculosis, and tetanus. Inspection And Monitoring Redevelopment projects or new construction are significant contributors to waste generation. It also poses a threat to wildlife and the general environment.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

OSHA citing maintenance equipment violations despite low risk

FDR Safety

Many of you may be wondering why, all of a sudden, OSHA is spending an inordinate amount of time inspecting the machines and equipment in plant maintenance areas. Typically, these machines are used for low-risk tasks performed by skilled workers. Despite the very low risk, OSHA is indeed citing for the things noted above.

OSHA 153
article thumbnail

Dissecting code language updates to lightning protection systems

Construction Specifier

LPI estimates $1.7 A properly designed, installed, inspected, and certified lightning protection and grounding system can virtually mitigate this risk to policyholders and the public. Beyond physical building damage, lightning poses a threat to data, security, and all electrical and electronic components in a building.

article thumbnail

All You Need To Know About Construction Project Management To Get Started

Construction Marketing

This process is called a design, bid, and build contract. Alternatively, the design, build contract style means that the same company will handle both the designing and construction of the building itself. The management team will inspect the building and identify any errors or defects and get them rectified.

article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240