Remove Design Remove Permits Remove Subcontracting Remove Travel
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

administration of the Job Order Contract (JOC), a Contract designed to provide the ORGANIZATION NAME with a flexible and responsive contractual capability in support of their renovation, repair, and minor new construction services needs. benefits, travel time, employee’s residence to job site, or vacation allowances are to be.

Contract 100
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

TVA Economic Development Loan Fund: A multimillion-dollar revolving loan program designed to stimulate investment and job creation in the TVA region. 573), was enacted in 1987 to stimulate business and industrial growth in designated areas of the state that are considered economically depressed. In December 2002, the former U.S.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone.

Income 75
article thumbnail

Feature Story: 2016 Economic Development Awards

Buisness Facilities Contributed Content

will be the team’s lead designer and Walsh Infrastructure Management will provide bridge maintenance over the life of the 25-year contract. Eleven different Pennsylvania-based construction companies already have been subcontracted to do much of the work, and many more opportunities will be made available as the project goes forward.

Indiana 40
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Use good judgement to ensure that travel costs do not become excessive. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. The use of performance-based work statements should result in more task orders being fixed-priced.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract).