article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

Project Delivery Phase Transitions: Estimates should be tracked throughout the life of the project and assumptions and estimate information must be well documented, including changes and what is and what is not in the estimate. The documentation should be in a form that can be understood, checked and verified.

article thumbnail

Behind the Build: Interview with Isabel Harlan, Sr. Engineer and Project Manager at Hatch LTK

Autodesk Construction Cloud

My last role with Dragados USA was as the Engineering Coordinator for the Long Island Railroad (LIRR) Third Track Expansion Project. I believe we need project teams to prioritize design interface coordination earlier on in a project’s life cycle so we have more bandwidth for innovative thought. ” — Isabel Harlan, Sr.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Upon approval from GSA” means when an agency either has a delegation of authority document from the Administrator of General Services or written approval from the Administrator or his/her designee before proceeding with a specified action. Landholding agency” means the Federal agency that has accountability for the property involved.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Upon approval from GSA” means when an agency either has a delegation of authority document from the Administrator of General Services or written approval from the Administrator or his/her designee before proceeding with a specified action. Landholding agency” means the Federal agency that has accountability for the property involved.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 01 11 13 Work Covered by Contract Documents. 01 32 00 Construction Progress Documentation. 01 32 33 Photographic Documentation. 01 32 36 Video Monitoring and Documentation.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 01 11 13 Work Covered by Contract Documents. 01 32 00 Construction Progress Documentation. 01 32 33 Photographic Documentation. 01 32 36 Video Monitoring and Documentation.