Validity of a Construction Cost Estimate – Public Sector
Job Order Contracting
MAY 4, 2023
Project Delivery Phase Transitions: Estimates should be tracked throughout the life of the project and assumptions and estimate information must be well documented, including changes and what is and what is not in the estimate. The documentation should be in a form that can be understood, checked and verified.