DebunkTheBIM: I stand corrected: 'clash detection is not a con!'
DebunkTheBIM
JULY 14, 2012
It is a way of legitimising half-baked designs, badly documented in unnecessarily inflated mounds of documents. I modeled the main ducts as there was some particularly tight areas, to find that the design had the main fresh air supply running along a grid line, i.e. through a line of columns. ► September. (4).
Let's personalize your content