article thumbnail

4 Commercial Construction Trends for Restaurant and Food Service Projects

HardHatChat

We’re also working with restaurant clients to make sure their mechanical infrastructure is set up to accommodate an extensive draft beer menu. In a retrofit scenario for a restaurant or bar setup where the existing underground chases are maxed out, the easiest way to boost capacity is installing additional chases and beverage lines overhead.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Recommended Tools, Materials, and Equipment: 1. This standard is not intended to address all fall protection related equipment. In addition to the procedure(s) outlined in this standard, the equipment manufacturer’s recommended maintenance procedure(s) and/or instruction(s) shall be strictly adhered. Tool Group A. Lubricants.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage Estimating also facilitates forecasting the labor, raw material and other overhead costs so that the contractors can arrange & deliver correct bids. As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors.

Bidding 40
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CAD: Cadmium, Computer-Aided Drafting. EQP: Equipment. EQPT: Equipment. EQUIP: Equipment. FF&E: Fixtures, Furnishings & Equipment. OH: Overhead. OHD: Overhead Door. He is a sample listing of abbreviation derived across a wide venue of sources. C/C: Center to Center. CAB: Cabinet.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 62 89 Construction Equipment Form. 01 85 00 Conveying Equipment Performance Requirements. 01 87 00 Equipment and Furnishings Performance. 01 85 00 Conveying Equipment Performance Requirements. 01 87 00 Equipment and Furnishings Performance. Project Delivery.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 62 89 Construction Equipment Form. 01 85 00 Conveying Equipment Performance Requirements. 01 87 00 Equipment and Furnishings Performance. 01 85 00 Conveying Equipment Performance Requirements. 01 87 00 Equipment and Furnishings Performance. Project Delivery.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CAD: Cadmium, Computer-Aided Drafting. EQP: Equipment. EQPT: Equipment. EQUIP: Equipment. FF&E: Fixtures, Furnishings & Equipment. OH: Overhead. OHD: Overhead Door. C: Courses, Curb, Channel, Degrees Celsius, Clock Outlet, Calcimine. C/C: Center to Center. C TO C: Center to Center.