Remove Drafting Remove Fabrication Remove Modeling Remove Permits
article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

This article contains a strong, generic model specification in standard CSI format for FRTW that will help specifiers: • Identify the critical code requirements for FRTW; and. • The following sections correspond to those used in the model FRTW specification. The test consists of a 7.6-m m (24-ft) long by 508-mm (20-in.) wide specimen.

article thumbnail

7 Best Construction Work Jacket

Work Gearz

And for those, like many construction professionals that work outdoors, many new work jacket models are weatherized to resist rain, snow, wind, and very cold temperatures. NEAT AND TAILORED DESIGN WITH DURABLE FABRIC. The lining is 100%nylon ad a stand-up collar will protect your neck from drafts. HEAT ACROSS BODY.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit 2017 - New Features and Enhancements

Revit OpEd

It applies to model elements, and graphic display effects, such as shadows and sketchy lines. You can select draft or production quality. When you upgrade a model, the rendering settings that were specified for the NVIDIA mental ray engine are mapped as closely to the appropriate settings for the new engine as possible.

Revit 40
article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

This model allows employees in all functions to see and interact with the entire team. The Director of Economic Development, Frank Fink will serve as the Parish guide to finding the right site, work through Zoning and Permitting issues and provide a complete set of regional demographic data and interpretation. Mary Parish.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 54 36 Building Information Modeling Exhibit. 01 41 26 Permit Requirements. 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. Requirements.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. ARB must approve hybrid truck and bus models for them to become eligible for the program. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” WORKFORCE DEVELOPMENT.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 54 36 Building Information Modeling Exhibit. 01 41 26 Permit Requirements. 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. Requirements.