article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CAD: Cadmium, Computer-Aided Drafting. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. OH: Overhead. OHD: Overhead Door. VF: Vinyl Fabric. WWF: Welded Wire Fabric. He is a sample listing of abbreviation derived across a wide venue of sources. C/C: Center to Center. CA: Compressed Air.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CAD: Cadmium, Computer-Aided Drafting. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. OH: Overhead. OHD: Overhead Door. VF: Vinyl Fabric. WWF: Welded Wire Fabric. C: Courses, Curb, Channel, Degrees Celsius, Clock Outlet, Calcimine. C/C: Center to Center. C TO C: Center to Center.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CAD: Cadmium, Computer-Aided Drafting. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. OH: Overhead. OHD: Overhead Door. VF: Vinyl Fabric. WWF: Welded Wire Fabric. C: Courses, Curb, Channel, Degrees Celsius, Clock Outlet, Calcimine. C/C: Center to Center. C TO C: Center to Center.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications. 05 06 50 Schedules for Metal Fabrications.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Coefficients. The team can decide how many coefficients to use. 3.5.3.1.7.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications. 05 06 50 Schedules for Metal Fabrications.