Remove Drafting Remove Feasibility Remove Schedule Remove Travel
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

These ports are reminding cross-country destinations that they can still get containers to them faster over land than it will take the big ships traveling through the Canal to reach East and Gulf Coast Ports. The 50-foot deep container berth was completed in 2012, two years ahead of its original schedule.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Improved accelerated depreciation schedules. Five-year accelerated depreciation schedules reduce corporate tax burdens. The Participating Lender sets all the terms and conditions of the loan (including premium levels, maturity dates, fixed or variable interest rates, secured or unsecured, amortization schedule, etc.)

Income 108
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

These contracts allow the government to acquire an indefinite quantity, within stated limits, of supplies or services during a fixed period, with deliveries or performance to be scheduled by placing orders with the contractor. Use good judgement to ensure that travel costs do not become excessive.