Remove Drafting Remove Feasibility Remove Schedule Remove Zoning
article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The 50-foot deep container berth was completed in 2012, two years ahead of its original schedule. started seeking city and state approval for its planned 70-acre intermodal facility in Southwest Baltimore, putting the project on schedule to handle increased cargo from the Port of Baltimore beginning in 2015.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Enterprise Zone Credit or Exemption: The Alabama Enterprise Zone Act (Act. The program provides state and local tax incentives and non-tax incentives to businesses and industries located within Alabama’s Enterprise Zones. May not have closed or reduced employment elsewhere in Alabama in order to expand into an enterprise zone.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

Zoning Fee 14. SITE PREPARATION The first 3 things listed – Demolition, Jacking & Shoring, and dirt management area unit scheduled for reworking comes. In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. Fire Protection Systems Accessory 8.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.