Remove Drafting Remove Insurance Remove Management Remove Viewpoint
article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

Viewpoint software seamlessly integrates with BIM for increased collaboration. Level 0 : Level 0 entails basically no collaboration, and only 2D CAD drafting is used. Level 1 : Level 1 BIM is a combination of 3D CAD and 2D for drafting. AIM is required to support an organization’s asset management system. BIM Levels.

BIM 189
article thumbnail

Officials Outline 'Preferred' Path Forward on California's Bay Delta.

ENR Construction

Salazar said the proposal is only a draft, and that other alternatives—including one that calls for no conveyance system—will be “fully considered.” Manage Subscription. Since Owners are Demanding Designers Carry Higher Insurance Limits, Is a Split-Limit Approach Best? Multimedia. Special Reports.

article thumbnail

Relationship between the designer and the contractor

Construction Business Owner

MANAGEMENT |. INSURANCE |. General Management. People Management. Equipment Management. I found myself wishing that there was a neutral corner to which each opposing viewpoint could be sent for a standing eight count in order to clear their minds and start the discussion over. construction management.