Remove Drawings Remove Fabrication Remove Modeling Remove Union
article thumbnail

Wisconsin: Where Collaboration Drives Industry Advancement

Buisness Facilities Contributed Content

In a recent European Union workshop on clusters, experts from Harvard Business School, MIT and the U.S. The panel also announced it would begin a comprehensive study of Wisconsin’s water cluster to learn from its achievements and model it for future cluster building, both in the U.S. and in Europe.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Building information modeling (BIM) is beginning to fundamentally change the building industry in a very positive way. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings.

BIM 45
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Building information modeling (BIM) is beginning to fundamentally change the building industry in a very positive way. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings.

BIM 40
article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

“We have an abundance of resources and, in particular, access to talent which is really impactful when you think about leading commercialization in technology as well as providing a foundation for companies to be able to draw their own workforces.”. GE’s Digital Division recently opened an office in Providence to tap into the tech talent.

article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Her MSc studies in Construction Project management have reinforced her strategic thought process in delivering above expectation and her understanding and importance of DfMA (pre-fabrication). She helped develop an auditing system that can monitor modeling quality issues automatically, thus streamlining the process for the teams at the firm.

article thumbnail

Veev’s Amit Haller on Scaling Innovation and Shortening the Supply Chain

Pro Builder

These fully closed and clad panels are trucked from Veev’s Union City factory complete with mechanicals, electrical, and plumbing systems (the walls have radiant heating) and assembled on site by Veev’s five-member field team, which can install a wall every 30 minutes using simple snap-together connectors similar to train car couplings. .

article thumbnail

Cover Story: 2014 Business Facilities Rankings Report

Business Facilities

The state also fully implemented its Tennessee Educator Acceleration Model (TEAM) educator evaluation system. More than 100 candidates have enrolled in the program, which has been recognized in Alabama, nationally and globally as a model in the arena of workforce development. Shelton is using the largest portion of the funds ($1.2

Louisiana 111