article thumbnail

GHG, SHG, SEC Regulations – Facilities Regs and Reporting Changes Coming Soon

Job Order Contracting

The proposed rules draw from existing disclosure frameworks including the Task Force on Climate-Related Financial Disclosures and the Greenhouse Gas Protocol. Base year GHG inventory is step one and determines your facilities carbon footprint, Step 2 is Reducing Carbon Footprint, Step 3 = Offset. Conclusion.

article thumbnail

BIM Strategy for the Built Environment

Building Information Management

Identify and Rank Problems and Opportunities – Inventory, Physical and Functional Conditions, Deficiencies and Costs and Associated Impacts vs. Time. as individual drawings, could all be produced directly from the model as a “view” of the required information.” – RICS. Phasing – Impossible to Implement BIM all a once.

BIM 49
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings.

BIM 40
article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o O perating, Maintaining and Testing Life Safety. o Total Cost of Ownership (TCO) o Life-­?Cycle Cycle Assessment (LCA). Demonstrate knowledge and ability with Lighting Systems – trouble shoot lighting systems, adjust lightingprogramming, replace lamps, replace ballasts, maintain lamps and ballast inventory, 2.