Sat.Feb 24, 2018

article thumbnail

Types of Documents for Heavy Civil Construction Projects

The Constructor

Types of design and construction documents for heavy civil projects such as engineering design documents, bid documents, construction documents are.

article thumbnail

What’s in a JOC Coefficient

Job Order Contracting

What’s in a JOC Coefficient should be specifically detailed in the Job Order Contract Request for Proposal. Here’s a listing of what is typically included in a construction contractor’s Job Order Contract coefficient… Contractor’s overhead and profit. Subcontractors’ overhead and profit. Insurance. All costs associated with bonding (specifically including bond premiums).

Overhead 100
article thumbnail

Factors Affecting Embankment Dams Design and Construction

The Constructor

There are number of factors that affect embankment dam design. That is why the designer needs to take these factors into consideration during the.

Design 189